Whirlpool RF263LXTB2 Especificações

Consulte online ou descarregue Especificações para Fogões Whirlpool RF263LXTB2. Whirlpool RF263LXTB2 Specifications Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 89
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
o,
0:/7„e3
4-0/041-/
ADDENDUM NO. 1
July 20, 2010
S'he
ir
M
RUHLIN•PANZICA*JENKINS
RPJ
C
ONSTRUCTION MANAGERS
MODIFICATIONS TO THE
BIDDING DOCUMENTS
FOR
BUCHTEL / PERKINS COMMUNITY LEARNING CENTER
PHASE 3— CLC PACKAGE
ISSUED BY:
GPD ASSOCIATES
RUHLIN/PANZICA/3ENKINS
ISSUED TO:
ALL BIDDERS
1.
GENERAL
A.
This addendum covers changes to the Documents and in closing the Contract will
become a part thereof. Each Bidder shall include these items to the extent they effect
his bid.
B.
These items modify only the portion of the Documents specifically noted. All odltr
wording remains In effect.
2.
PROJECT MANUAL
A.
Specification Section 01500, TEMPORARY FACILITIES
1. ADD attached "Akron Public Utilities Bureau Notice to Contractors" to the end of
this section.
B.
BIDDER SCOPE CLARIFICATION QUESTIONS:
Q:
Will background checks be required?
A:
No
All other questions received up through July 19, 2010 that have responses, can be found in
GPD Associates portion of Addendum #1.
Deadline for submission of Pre-Bid questions is 12:00 Noon, Wednesday July 28, 2010.
CM
BUCHTEL / PERKINS PHASE 3 — CLC PACKAGE
ADDENDUM NO. 1
Vista de página 0
1 2 3 4 5 6 ... 88 89

Resumo do Conteúdo

Página 1 - S'he

o,0:/7„e34-0/041-/ADDENDUM NO. 1 July 20, 2010S'he irMRUHLIN•PANZICA*JENKINSRPJCONSTRUCTION MANAGERSMODIFICATIONS TO THEBIDDING DOCUMENTSFORBUCHT

Página 2

B116B, B118B, B118AA, 8118AB, B135A, B146F1, B147AA, B147BA, B147CA,B152A, B152B, B154B, B154B1, B154C, B154C1, B158A, B158AA, B158BA,B162F, B162DD, B

Página 3 - GENERAL NOTICE TO CONTRACTORS

33.A-104: Revisions to Masonry Lab and related changing rooms. Entire sheet issued.34.1-103: Revisions Masonry Lab and related accessory rooms. Entire

Página 4 - Sm./m/97-6RJ

7. Sheet M-721, Control Diagram, Drawing deleted from the project.ELECTRICALI. Sheet E-103, First Floor Lighting, Area C, no sketch provided:a.Remove

Página 5

FIRE ALARM1. Sheet F-501, Fire Alarm Details. Added interconnection to the fire alarm system forthe emergency lighting within the auditorium to be ene

Página 6 - Response:

1.Unit CornstrengthBuchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents —

Página 7

/•ft• I AL, I •4:11OSFC Project # 55-7110-90294252.2MANUFACTURERSGPD - 2007271.15 Phase 3 CLC Package— Bidding Documents — July 1, 2010A.Accepta

Página 8

BuchteypgiimmLearnin CenterGPD - 2007271,15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 1, 20101.Manufacturers: S

Página 9

Ce terD-201 7l.5Phase 3 CLC Package— Bidding Documents — July 1, 2010er 0.0mmuni Le• IIOSpc Project # 55-7110-9029425A.acer Flooring, LLC.Conner Spo

Página 10

uchtcl/Perkins CommunityCenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package– Bidding Documents – July 1, 20103.6PAINT SCHEDUL

Página 11

Buchtel/P:I 4Co I_ILJ en0 271.OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 1, 2010C. Anchors and Inserts: Use nonferrou

Página 12

.,3.PRE-BID MEETING MINUTESA. Pre-Bid Meeting Minutes are available for review upon request by contacting the CM andare for reference only.SEE ATTACH

Página 13

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project #55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 1, 2010b.Finish

Página 14

auchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package- Bidding Documents - July 1, 2010E.Clini

Página 15

113..10glaeLkir ' s Community Learning CenterGPD - 2007271.15 OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 1, 2

Página 16

B-1S/ hte1/PerkinLCommunitv Learning CenterGPD - ;007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 1, 2010PART 4

Página 17 - Action Floor Systems

Buchtel/PerIcins Community Learning CenterGPD Project #2007271.15OSFC Project #55-7110-9029425Phase 3 - CLC Package - Bidding Documents - July 1, 20

Página 18

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project #55-7110-9029425Phase 3 - CLC Package - Bidding Documents - 07-01-10ItemDescri

Página 19 - Dark Bronze

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSpc Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 1, 2010SECTION

Página 20

.1u h1111PD 1070114 •OSFC Project # 55-7110-9029425Phase 3 CLC Package- Bidding Documents - July 1, 2010b.Nexansc.Cerrowired.Southwiree.Encore Wire2

Página 21

Bet P rkin I it II umOfOSFC Project # 55-7110-9029425D- P0 7.15Phase 3 CLC Package- Bidding Documents - July 1, 2010F.Seal around cables penetrating

Página 22

elom00727OSFC Project # 55-7110-9029425Phase 3 CLC Package- Bidding Documents - July 1, 2010C.Comply with NFPA 70.D.High Efficiency Dry-Type Transf

Página 23 - GPD - ;007271.15

Brian M. Gresser, P.E.WPC Plant AdministratorJames L Six, P.E.Water Supply Plant AdministratorRandall A. Monteith, P.E.Pilots AdministratorAndre L Bla

Página 24

c ti o litLe• el'_ 07 1OSPC Project # 55-7110-9029425Phase 3 CLC Package- Bidding Documents - July 1, 20102.3HIGH EFFICIENCY DRY-TYPE DISTRIB

Página 25

• 111 -•I•OSFC Project # 55-7110-9029425PD - 2 01Phase 3 CLC Package- Bidding Documents - July 1, 2010erkL200% rated neutral 60 Hz, 10kV BILM.Maxi

Página 26

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 2010SECTION

Página 27

iluchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 2010a.Elem

Página 28

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 20102.Lamp

Página 29

_auchteUPerkins Communi_W Learning CenterOPD - 2007271.15OSFC Project 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 20101.Lamp Ra

Página 30

hteJJPerkinsgimuni Learnin Center GPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 20102.4LAMPSA.

Página 31 - 10kV BIL

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project #55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 2010C.Misce

Página 32

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project #55-7110-9029425Phase 3 CLC Package- Bidding Documents - July 20, 20104.Supply

Página 33

lilachtel/Perlcins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 20104.Fi

Página 34

330-753-022905-23-0603:00R1FROM-Cavanaugh BuildersRandall A. Monteith, P.P.Pilots AdministratorAndre L BlaylockBusiness Services Administrator1-OT1

Página 35

E uchteUPerkins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 2010D. Inst

Página 36

Buchtel/Perkins Community Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents —July 20, 2010C.Sched

Página 37

Buchtel/Perkins Cominunity Learning CenterGPD - 2007271.15OSFC Project # 55-7110-9029425Phase 3 CLC Package— Bidding Documents — July 20, 2010E.Con

Página 38

BUCHTEL PERKINS CLCPHASE 3- CLC PACKAGE1040 COPLEY RD, AKRON, OH 44320ADD #:REFERENCED DRAWING:C-102RFIDATE:07-19-10sicErclitC-4SCALE1"=40'6

Página 39

-0VAS MI soCliont litrINS.L DimAYIN INC."G PD A&Ci*ASSOCIATES AkOn Pubic Scfrolsas earron.ty Leaning Centers520 South Main Street, Suite 25

Página 40

1/2" EXP JOINTMATERIAL. REMOVETOP 1/2" AFTERCONCRETE IS SETUP & FILL w/POURABLE SEALANTGALS ?4LI 50454,5 OMNI III/MEN IC RUHLIN•PANZICA•

Página 41 - GPD - 2007271.15

7/20/103/4" = V-0"CUM FO110.041 DulurS a COYMLNRUHLIN•PANZICA*JENKINSBUCHTEUPERKINS, C.L.C. PHASE 3REFERENCED DRAWING:SKETCH #:GPDIriinRPJS-

Página 42

BUCHTEL PERKINS CLCREFERENCED DRAWING:SKETCH #:A-4ADD #:1040 COPLEY RD., AKRON, OH 44320RFI #:SCALE'DATE:PHASE 3 CLC PACKAGENTS07-19-10--,r—.\:

Página 43 - STAGE PHASE PLAN

07531.A07531.007531.601 [4105300.A012 1/2" 016" O.C.]06160.A05300.A0105400.A [2 1/2"0 16 0.c.]1.0. STUDS&+31 —1 3/8".A.F.F.1A0

Página 44 - ASSOCIATES

A3 HEAD 1104810B. B [12x8x16]04810B.B [8x8x16]07842.AC4 JAMB 807950.A[WWJS-2]07920.A04810B. D8110.A04810B.B[12x8x16]04810B.D08110.A07920.ABUCHTEL PERK

Página 45

2007271.15ADDENDUM NO. 1toBIDDING DOCUMENTSForPHASE 3— CLC PACKAGEBUCH'TEL/PERICINGS COMMUNITY LEARNING CENTERJuly 20, 2010A.The original bidding

Página 46 - 2 PORTAL DETAIL

JAMB 46Al11 5/8'04810B.B[8x8x16]04810B.ATY08331.AREFERENCED DRAWING SKETCH #.ADD #:BUCHTEL PERKINS CLCA-607,A-608A-41040 COPLEY RD., AKRON, OH 44

Página 47 - PARITAL SOUTH ELEVATION

REFERENCED DRAINING:-SKETCH St:ADD #BUCHTEL PERKINS CLCA-609A-S1040 COPLEY RD., AKRON, OH 44320RFI tkSCALE:DATE:PHASE 3 CLC PACKAGE1"=1'-0&q

Página 48 - SECTION DETAIL

REFERENCED DRAWING:SKETCH #:ADD #:BUCHTEL PERKINS CLCA-403Ab61040 COPLEY RD., AKRON, OH 44320RFI:SCALE:DATE:PHASE 3 CLC PACKAGE1/4"=1'-0&qu

Página 49 - A3 JAMB 11

REFERENCED DRAWING:SKETCH #:ADD #:BUCHTEL PERKINS CLCA-1231040 COPLEY RD., AKRON, OH 44320RFI #:SCALE:DATE:PHASE 3 CLC PACKAGE1/8"=1'-0"

Página 50 - GLASS INTERSECTION

REFERENCED DRAWINGSKETCH #:ADD #:BUCHTEL PERKINS CLCA-307A-81040 COPLEY RD., AKRON, OH 44320RFI #:SCALE:DATE:PHASE 3 CLC PACKAGE3/4"=1'-0&qu

Página 51

BUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, OH 44320PHASE 3 CLC PACKAGEREFERENCED DRAWING: SKETCH #:ADD*:A-102A-91RP! tt:SCALE:DATE:-NTS07-19-10

Página 52 - A2 ADMINISTRATIVE AREA

FE.."REFERENCED DRAWING:SKETCH N:ADD ft:BUCHTEL PERKINS CLCG-001A-101040 COPLEY RD., AKRON, OH 44320RFI #:SCALE:DATE:PHASE 3 CLC PACKAGE1 113&quo

Página 53 - FIRST FLOOR REFLECTED

PER, Fg•-•-i,sr\ oe.\/\BUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, OH 44320PHASE 3 CLC PACKAGEREFERENCED DRAWING: SKETCH #:ADD #:G-002A41RFI #:SCA

Página 54 - A3 WALL SECTION

SHEET KEYNOTES 1.WALL OF DRAMA STORAGE ROOM B155 BELOW. TO EXTEND TO DECKABOVE.2.LOUVER LV4 HAS SHIFTED WEST 4'—Os TO PROVIDE CLEARANCE FOREXTEND

Página 55 - 1) PARITAL FLOOR PLAN ilvg

REFERENCED DRAWING:SKETCH t$:ADD #:BUCHTEL PERKINS CLCA-104A-43I1040 COPLEY RD., AKRON, OH 44320RR #:SCALE:DATE:PHASE 3 CLC PACKAGE1 /8"=1-0"

Página 56 - BUCHTEL PERKINS CLC

..5.Capital Cast Stone submitted a request for cast stone masonry to beconsidered as an approved equal to manufacturers indicated under Section04720.2

Página 57 - LIFE SAFETY PLAN

REFERENCED DRAWING: SKETCH #:ADD #;BUCHTEL PERKINS CLCA-107A-1-41040 COPLEY RD., AKRON, OH 44320RFI #:SCALEDATE:PHASE 3 CLC PACKAGE10=1,-0"07-19-

Página 58

REFERENCED DRAWING:SKETCH #:ADD:BUCHTEL PERKINS CLCA-109Al 51040 COPLEY RD., AKRON, OH 44320RF1SCALE:DATE:PHASE 3 CLC PACKAGE1/8"=t-0"07-19-

Página 59

BUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, OH 44320PHASE 3 CLC PACKAGEADD tO:DATE:07-19-10DIMENSION CHANGE.2. ADA SEATING AREA HAS1'-8.A3 ENLARGE

Página 60

9II00\‘':e VACJEMEMEMEMEM.1112111•• • –•••....- -...foi\\N ••n::,1/4"spool,11111111IIIIIIIIIIIIIIIIIIIIIIIIIII0111111I IiI

Página 61 - A3 FIRST FLOOR PLAN AREA

REFERENCED DRAWING:SKETCH 31:ADD #:BUCHTEL PERKINS CLCA-105A-1431040 COPLEY RD., AKRON, OH 44320RFISCALE:DATE:PHASE 3 CLC PACKAGE1 /8"=t-0"0

Página 62 - A3 ENLARGED PLAN

05500.A02048108.H [2 0 1.5]04810B.A [FB-2]BUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, OH 44320PHASE 3 CLC PACKAGE05300.A0107210.004810B. D04810B.A[FB-2

Página 63 - ,1/4"

ACCESS LADDERREFERENCE KEYNOTES DIVISION 505500.JREFERENCED DRAWING:SKETCH #:ADD JO:BUCHTEL PERKINS CLCA-403A-201040 COPLEY RD., AKRON, OH 44320RFISCA

Página 64 - W.V.V.M.W.V.V

F.F. 2A+14-0 A.F.F.1AC5500._AE1,0. F.F. IA!NMI•REFERENCED DRAWING: SKETCH #:ADD #.BUCHTEL PERKINS CLCA-403A-21 1040 COPLEY RD., AKRON, OH 44320RFI

Página 65

07950.A [EWJS-2]048108.A04810B.H [3107272.A04810B.B[12X8X16]REFERENCED DRAWING:SKETCH #:ADD #:BUCHTEL PERKINS CLCA-504A-221040 COPLEY RD., AKRON, OH 4

Página 66 - El ELEV. I CO3A

RUHLIN • PANZICA • JENICKSBUCHTEUPERKINS CLC REFERENQED DRAWING: SKETCH #:T-103SK-T103-ACONSTRUCTION MANAGERSGPD ACT&ASSOCIATESP.R *:07BUPK902942

Página 67 - ELEV. 2 EL2

7. Spec Section 10505 Metal Lockers: Revise section 2.4/C13 to read - [Type 7]: 12"wide x 15" deep x 72" high, single tier. Refer to dr

Página 68 - C2 PLAN DETAIL

SHEET KEYNOTES35. NEW 4" SAN TO FD-2. CONNECT TO NEW 4" SAN.GC0 T/-4" SAN-Nt2"CW IBUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, OH 44

Página 69 - ACT&

REFERENCED DRAWING:SKETCH #:A DDBUCHTELRERKINS CLCP-102P-072010-021040 COPLEY RD., AKRON, OH 44320RF I II;SCALE:DATE'PHASE 3 CLC PACKAGE1/8"

Página 70 - SHEET KEYNOTES

REFERENCED DRAWING:SKETCH #:ADD #:BUCHTEL PERKINS CLCP-105P-072010-031040 COPLEY RD., AKRON, OH 44320RFI #:SCALE:s.DATE:PHASE 3 CLC PACKAGE1/8"=

Página 71 - IIIIMEMEMEMEI

MAINROOM1 ELECTRICALn 1NEW NATURAL GAS METER ANDPRESSURE REGULATOR ASSEMBLYFURNISHED BY DOMINION FORINSTALLATION BY P.C. MINIMUMCAPACITY REQUIRED 12,5

Página 72 - #."."

11111P:AAEL:Odr-73,40'37tat14•461+, ON!..V.6.!...!:!..V.46W.C.4.!: IGWH-2•-** 6"OD150 MBH;;;•Ativ,-.ccw.mwmcw:c...x.•;,;•;•;•;ymvx9,

Página 73

1/8"=1*-0"Ai SECOND FLOORPLUMBING PLAN AREA 'D' P-113REFERENCED DRAWING:SKETCH It:ADD 0:BUCHTEL PERKINS CLCP-113P-072010-061040 C

Página 74 - I B1 601

BUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, OH 44320PHASE 3 CLC PACKAGE_REFERENCED DRAWING: SKETCH #:ADD #. 1P-401P-072010-07IRFI #:SCALE:DATE:—1

Página 75

(I11•_.M0 ".`•0 C1/ 0 013 1r03 m —1m -.< M(4 xi 1—P P 1.10 > Mg gZ. ..n.0.FYI :1: 0t I-(a 0iv0PLUMBING FIXTURE SCHEDULESYM.1111.1111111.11

Página 76 - ,

BUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, OH 44320PHASE 3 CLC PACKAGEADD #:REFERENCED DRAWING:P-606FRF1DATE:07-20-10SKETCH #:P-072010-09SCALE:N.T.S

Página 77 - .111111110113

EXISTING 2" CWINSTALLED IN PHASE 1SUPPLYING WATER TOTHE FOOTBALL FIELD.REFERENCED DRAWING.P-608RFI #:BUCHTEL PERKINS CLC1040 COPLEY RD., AKRON, O

Página 78

1.Sheet S-103: Revised Area 'C' Masonry Lab slab-on-grade work.2.Sheet S-111: Revised Area 'C' Masonry Lab roof framing.3.Sheet S-

Página 79 - WATER RISER DIAGRAM

EXHAUST FAN SCHEDULEMARKMANUFACTURERMODEL NO.CAP.CFMESPINCHESFANHPIWFANRPMELEC.OPER.WGHT.ACTIVATEDREMARKSGREENHECKSSI - 1 4-440-C8700.1251/8860120/150

Página 80 - EXHAUST FAN SCHEDULE

0DIFFUSER AND GRILLE SCHEDULEMARKMANUFACTURERMODEL NO.NECKSIZEFACESIZE MOUNTINGMAX.CFMPATTERNSP @ MAX.CFMREMARKSPRICE#5201 rx6"20"x8"SU

Página 81 - AIR CLEANING UNIT SCHEDULE

REMARKS>FURNISH UNIT WITH E3 STAINLESS STEEL HEAT EXCHANGER, ELECTRONIC BURNER MODULATION, LONMARK DDCCOMPATIBLE, OUTSIDE/RETURN AIR DAMPER PACKAGE

Página 82 - MAKEUP AIR UNIT SCHEDULE

BUCHTEL PERKINS CLCREFERENCED DRAWING:E-104SKETCH #:E-072010-01ADD1040 COPLEY RD., AKRON, OH 44320RFI #:SCALE:DATE:PHASE 3 CLC PACKAGE1/8" =07-20

Página 83

0IN)INTERIOR LIGHTING FIXTURE SCHEDULE - 16511TYPElaVA4LAMPSLEDEVENILLUMAg•DESCRIPTIONSIN eA 40,34T; AC • LW/11P H. WS;RED UNIFORMLY ILLUMINATED

Página 84

0b1111TECH.I CLOSETR.R.B1411H-AC-7GP2-33GP2-43%:::•n•n••••...1. • 1.1,- , ,' ..."Pli 1.: A ., 0,. ••4 4I..nI.JE!. ,...,::::. pm P,1.: .

Página 85 - AI EMIR

BUCHTEL PERKINS CLCREFERENCED DRAWING:E-401SKETCH #.E-072010-04ADD #:1040 COPLEY RD., AKRON, OH 44320RF1 #•SCALE: DATE:PHASE 3 CLC PACKAGE1 /4"=t

Página 86 - 3 ELECTRICAL CLOSET B145 frN

v-.-..n10•1•1n1nm0 ••••n0 C-0 0 0-a Im--Ico m-c.a3 xi I--o p -13r - ,CI > 1 I 1"0 X 7J> X0 0 -.Z Z0 0 03m 2 (")43 00t r"IVMECHANI

Página 87 - 2 (")

inPANEL PPJDESCRIPTIONPhaseAnPhaseBPhaseCK1CKT.BKR /.0 6.BCCKT.BKR /PolesPhaseAKWPhaseBKWPhasecDESCRIPTION0.94Isra0.95MINNMAU-1I0.941/1Mn20 / 30.95AC

Página 88 - PANEL PPJ

SHEET KEYNOTES22.PROVIDE A N.O. AUXIUARY CONTACT SO THAT WHEN THE BUILDINGIS PLACED INTO ALARM MODE, THE SOUND SYSTEM IS "MUTED".PROVIDE A C

Página 89

8.A-105: Brick veneer on the north wall of 8169 has been labeled as walLtype 11A.See sketch A-18.9.A-106: Wall section marker A5/A-304, at north exter

Comentários a estes Manuais

Sem comentários